Non-performance in the construction industry
Non-performance is a general term that describes a party which fails to perform; in fact, the term can cover all forms of failure in performance. A student who fails end-of-year exams may be regarded by the school as a non-performer. In this respect, non-performance is not contractually linked – the student never promised to do well and there was no contact entered into, written or otherwise.
In simple terms, a contract is a legally-binding promise. From a legal perspective, the basis of every contract is that all parties must fulfil all of the contract's terms. Non-performance occurs when one party to the contract does not fulfil the contract terms – failing to live up to their contractual obligations. Such a failure is not necessarily a breach of contract although it could lead to a breach of contract.
A breach of contract in English Law is non-performance that is not excused because it is the non-performance of a contractual obligation, i.e. a promise was made and was not kept. A breach of contract entitles the innocent party to receive damages from the guilty party. It may also allow the innocent party the right to terminate the contract.
An example of non-performance is a contractor who fails to provide sufficient labour, materials or equipment to a project, leading to a delay to the completion date.
Bonds can provide a degree of protection for the client. Bonds are an undertaking by a bondsman or surety to make a payment in the event of non-performance. Bonds can be 'on demand' or 'conditional', with conditional bonds requiring that the client provides evidence of the contractor's non-performance, and that as a consequence the client has suffered a loss.
[edit] Refusal to perform or declaration of non-performance
A declaration of non-performance is another form of non-performance. One party declares they are abandoning any further performance under the contract or refuses to fulfil an essential aspect of the contract. In this case, the innocent party can discharge themselves from any further performance obligations.
[edit] Related articles on Designing Buildings Wiki
- Bonds in construction contracts.
- Construction contract conditions
- Contractual obligation.
- Contractual right.
- Delay analysis.
- JCT
- JCT Construction management contract
- Performance bond
- Procurement team
- Standard form of contract
- Tender documentation for construction projects
- Traditional contract for construction
- Traditional contract: tender
- Typical tender process for construction projects
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February